Tuesday, August 6, 2013

Working on the Deck!

It is taking a lot longer and costing a lot more, but the new deck will be worth it.





The deck started with 2 feet deep footings filled with concrete, then rebar with epoxy to connect the piers to the concrete in the footings.  Then the 6X6 posts were attached.




Then the deck joists were attached to the frame.  And then the decking is being installed.  Beautiful Redwood!